Owner: Board of Regents of the University System of Georgia
Contact: Rick Parker
Phone: (404) 651-1069

Start: April 2007

 

West Campus Plant Chiller III and Cooling Tower Addition, 10 Peachtree Center Ave. – Atlanta, Georgia

Replacement of existing Chiller and Cooling Tower.

Contract Value: $ 1,135,000
Consultant/ME: Johnson, Spellman & Assoc.
Contact: Mark Rood, P.E.
Phone: (678) 336-5415

Finish: November 2007

 
 

Owner: Henry County Board of Education
Contact: Allen Guimarin
Phone: (770) 957-6601

GC: Manhattan Construction Company
Contact: John Champagne
Phone: (404) 351-7000

Mech Contract Value: $4,784,500

 

Woodlands High School and Middle School Stockbridge, Georgia

Construction of a new High School (273,120 sq. ft.) and Middle School complex (132,679 sq. ft.). Facilities include classrooms, labs, gymnasiums, athletic fields, stadium, administrative areas and kitchens.

Design: Manely, Spangler, Smith Architects
Contact: Blake Brewster
Phone: (770) 227-5473

Contract Price: $47,500,000
Start: September 2005
Finish: April 2007

Eng.: Andrews, Hammock, and Powell
Contact: Jim Hughes
Phone: (478) 405-8301

 
 

Owner & Design: GDOC
Contact: Larry Latimer
Phone: (404) 635-4627

GC: Schadsons Corporation
Contract Price: $3,706,517
Start: June 2004
Finish: September 2005

  Georgia Diagnostic & Classification State Prison, Plant Loop Steam Upgrade—Jackson, Georgia

Replacement of existing underground steam loop system including interior building steam pipe, air handling unit coils, unit heaters, heat exchangers and domestic water. Work must be performed in numerous phases, starting with the installation of the all new pre-insulated site piping and precast vaults while at the same time performing the encapsulation and abatement of the asbestos contaminated crawlspaces and tunnels below and throughout the facility.

The next phase consists of installing a parallel steam and condensate system within the crawlspaces, tunnels and the facility itself to the point of connection at the various pieces of equipment including a fully operational kitchen and laundry, and all air handlers, unit heaters, condensate pumps, and new heat exchangers.

The next phase requires activating the new steam system along with the old and changing over each piece of equipment until all equipment is operational on the new system. The final phase is the deactivation and demolition of all of the old steam piping, condensate piping, deleted or replaced equipment and removal of all from the site.


 
 

Owner: Cherokee County Board of Education
Contact: Jim Sarks
Phone: (770) 479-1871

GC: Balfour Beatty Construction
Contract Price: $24,500,000


Design: Chegwidden Dorsey Holmes
Contact: Joseph Byce
Phone: (404) 875-0356

Start: January 1995
Finish: November 1996


Eng.: Spurlock & Associates, Inc.
Contact: Barry Spurlock
Phone: (404) 633-0245


 

Woodstock Middle/High School, 2000 Towne Lake Hills South Drive—Woodstock, Georgia.

New Construction of the nation's largest public secondary High School & Middle School, a 400,000 sq. ft. building.

New High School: 273,120 sq. ft., 1-story, 1 building, and 812 parking spaces. Facilities included: activity, administrative, auditorium, band room, basketball court, break room, cafeteria, classrooms, courtyard, dressing/changing, equipment storage, gymnasium, kitchen, laboratory, library, locker room, lounge, maintenance, mechanical room, media center, offices, restroom, storage, walk-in freezer.

Middle School: 132,619 square feet, 1 story, 1 bldg
Facilities included: administrative, auditorium, break room, cafeteria, food storage, kitchen, lounge, mechanical room, media center, nurse's office, offices, restroom, storage, walk-in freezer.

 
    Replacement Naval Hospital @ Marine Corps Air Station, Cherry Point—North Carolina

Construction of a new 3-story Naval Hospital, approximately 220,000 sq. ft. Facilities include: a reception area, courtyard, pharmacy, pediatrics, family practice, walk-in clinics, labs, radiology department, dental command, administration office, birthing rooms/delivery rooms, nursery and operating rooms.
  Owner: Dept. of Navy Inc.
Contact: Commander Phil Dalby

GC: Pizzagalli Construction Co.
Phone: (919) 481-3323

Contract Price: $25,500,000


Award: AGC Pinnacle Award for Partnering


  Design: Rogers, Lovelock & Fritz
Contact: Mike Halfing
Phone: (919) 466-4735

Start: November 1992
Finish: September 1994

Eng.: Rogers, Lovelock & Fritz, Inc.
Contact: Mark Yankech
Phone: (407) 647-1039
 
    New Marietta High School, 1171 Whitlock Avenue—Marietta, Georgia

Construction of new 2-story 365,000 sq. ft. public High School building.
  Owner: Marietta City Schools
Contact: Danny Smith
Phone: (770) 422-3500

CM: MB Kahn Construction Co.
Contact: Charles Johnson
Phone: (770) 435-9700 ext. 22

  Design: Perkins & Will
Contact: Mike Reed
Phone: (404) 873-2300

Contract Price: $35,000,000
Start: January 2000
Finish: August 2001

Eng.: Spurlock & Associates Inc.
Contact: Barry Spurlock
Phone: (404) 633-0245
 
    Environmental Science & Technology Bldg., Georgia Institute of Technology—Atlanta, Georgia

Construction of a new 5-story (287,000 sq. ft.) research laboratory building. Facilities include laboratory, classrooms, lecture theater, offices, administrative areas and loading docks. This building is the largest ever built on GA Tech's campus.
  Owner: GSFIC
Contact: Andrew Triemer
Phone: (404) 656-3426

GC : Archer Western Contractors, Ltd.
Contact: Joseph (Joe) Appleton
Phone: (404) 495-8700


  Design: Hellmuth, Obatha & Kassablum
Contact: Mike Greer
Phone: (404) 439-9000

Contract Price: $46,595,000
Start: August 2000
Finish: December 2002

Eng.: Newcomb & Boyd
Contact: Andrew Dymek
Phone: (404) 352-6628
 
    Cherokee County Public Safety Facility, 150 Chattin Drive—Canton, Georgia

Construction of a new 4-story (205,000 sq. ft.) 384-bed adult detention center and 2-story Sheriff's Department office's. Facilities include offices, administrative areas, commercial kitchen, laundry, and loading dock. The housing building is comprised of eighty precast modular cells and a 4-story precast dorm unit.
  Owner: Cherokee Board of Commissioners Group
Contact: Emily Lemeke, Chairman
Phone: (770) 437-2700

CM: Facility Program Management, Inc.
Contact: John Navarro
Phone: (770) 437-2700
  Design: The Facility Design
Contact: Carl Steuer
Phone: (404) 437-2700

Contract Price: $30,000,000
Start: May 2001
Finish: October 2002

Eng.: Telesis/CDG
Contact: Donald H. Sheffield
Phone: (678) 365-2444
 
    VA Ambulatory Care Center—VA Medical Center, 1100 Tunnel Rd.—Asheville, North Carolina
Construction of a new 3-story (100,000 sq. ft.) addition to the Medical Center and an addition to the mechanical plant. Also, includes demolition (40,000 sq. ft.) and renovation work in the existing hospital building, primarily located on the first floor. The work includes ambulatory care clinics, along with laboratories, emergency services and surgery and some other functions.
  Owner: Department of Veterans Affairs
Contact: Charles Dana Quel

GC: King Construction Company, Inc.
 

Design: Freeman White, Inc.
Phone: (770) 523-2230
Contact: Pat King, Jr.
Phone: (502) 429-5200

Contract Price: $28,500,000
Start: April 1, 1999
Finish: June 2002

Eng.: Engineer Design Group, P.A.
Contact: David A Martin
Phone: (704) 525-2683

 

     
 